2 The Green Sherborne…..June 2016

Its all coming together….
Ahh thats better
Nearly there.
Kitchen looks good
Bathroom looking better
Toilet looks great too…
Laundry room
Washing machine has somewhere to go
Passage now looks great, no more falling ceilings and damp walls
Street facing room 1
We rewired the whole flat and all is up to date and easily accessible…
Back room
Back room
Bedroom 2 street facing, all that is needed is the carpets.
Bedroom 2
Passage going down
Passage going down
Going up to loft room……. boy it needs the carpets…………
Loft room looking great now…
We had to install packing space on either side of the loft room
Loft room overlooking “The George” Sherborne’s oldest pub…
Back room
Back room damp in walls….
Backroom ceiling needs replacing……. water was leaking through…… you could see sky light through the roof
What an ugly old bathroom
Pipes everywhere
What an old cistern…. oh and the pipes…
So dated
More damp
Note the pipes on the kitchen wall
Plaster falling off.
The pipes on the kitchen wall.
The ceiling falling in… in the kitchen also.
Kitchen
Old serving hatch.
Kitchen continued.
Rotten window…… will need to replace.
Bedroom 2 street side
Bedroom 2.
Stairs going up to loft.
Stairs going down to street.
Water coming through the ceiling in the passage.
Room 1 Street side.
Room 1 street side.
Room 1 Street side.
Coat/storage room.
Old dining room with serving hatch.
Old dining room with serving hatch.
Ceiling coming down in dining room.
Water ingress in dining room.

Comments are closed.